partner

Home > Partners >
Activity Description/Scope
Move Is the physical relocation and installation of a device or devices to a new location within a single location - as per the scope of an 'Add'.
Add Is the installation of a device or devices at a single location. As part of the installation process, engineers will be required to work with remote teams to physical install, configure (access enablement only), label and cables/patch devices - confirming connectivity once the process has been completed.
Change The logical configuration, physical re-configuration and/or re-cabling of a device 'in situ' (i.e. in rack).
Delete Is the logical decommissioning and physical removal of one or more devices from their physical location.
Reporting For all MACD activities engineers will be required to provide reports detailing device identifiers, location and asset tagging information.
Asset Tagging Engineers will be required to asset tag new and/or existing devices with Xetimes provided asset tags. They may also be required to label devices as per the procedure/requirements set out in the Xetimes Engineer Handbook.